PR015-21208-W01 Improvements in Compressor and Pump Station Facility Efficiency

Apr 5, 2023

This research effort focused on identifying equipment and processes that can be applied at compressor and pump stations to improve station operating efficiency, thereby reducing greenhouse gas (GHG) emissions. The project approach included a literature review and a PRCI member-company survey followed by evaluation and analysis and reporting tasks.

You Might Also Like

PR214-234504-W01 MAT-1-8 Post-Heating and Interpass Control Webinar

This webinar describes the work undertaken to numerically model the hydrogen diffusion in in-service fillet welds across a wide variety of pipe attributes, welding conditions, and thermal conditions. The document includes recommendations for post-welding...

PR015-242008-W01 Recompression System Best Practice Guideline

This project surveyed project member companies for recompression data during their day-to-day operations. This data was compiled and incorporated into the conceptual design of cost-effective packages aimed at maximizing value without compromising throughput. Major...