Research Report Library > Reports
Report
PR186-215102-R01 Subsea Pipeline Risk-Based Inspection Benchmarking
Abstract
There are many standards, recommended practices (RP) and guidelines available for subsea pipe-line integrity management (PIM). In all of these, inspection is a key part of managing the integrity of subsea pipelines. However, detailed coverage of risk-based inspection (RBI) and detailed inspection planning is limited in these standards, RPs and guidelines; optimization of inspection and inspection frequency is generally determined at operator’s discretion unless strictly regulated by authorities. Thus, there is a need to identify operator best practices and attempt to define a unified decision-making process to optimize inspection and inspection frequencies. This document:
· Summarizes the most relevant standards, RPs and guidelines with respect to RBI
· Reports the findings from answered questionnaires and interviews with operators, and
· Identifies potential paths forward to reach a unified inspection planning best practice
Digital Access
After purchase, you will receive a download link to the report you purchased. Please confirm the email address you use to purchase the report is the email address you would like to receive the report.
If you have any trouble receiving the download instructions, please first check any spam or junk folders. Reach out to support if you need further assistance.
PR186-215102-R01 Subsea Pipeline Risk-Based Inspection Benchmarking
Quantity
Digital products are limited to 1 per purchase
List Price
$250
Member Price
$0
Members will be redirected to a member-only report database for access to all reports. You must have a login to access reports for free.
