PR-218-174512-R01 Full-Scale Surface Loading Testing of Buried Pipes
Abstract
In 2015, Kiefner and Associates, Inc. (Kiefner) completed the ENV-6-1 project “Field Validation of Surface Loading Stress Calculations for Buried Pipelines” in which Kiefner monitored three buried pipe test segments at the Berne Station in Ohio to measure circumferential and longitudinal stresses due to heavy equipment crossing over the segments. This ENV-6-2 study “Full-Scale Surface Loading Testing of Buried Pipes Vibratory Compactor and Temporary Crossing” ionducted in the same location and on the same three pipeline specimens. The objective of this project is to develop surface loading criteria for pipelines with shallow burial depth under temporary crossings (e.g. mat, bridge, or steel plate) and pipeline subjected to dynamic loading from a vibrator compactor.
Digital Access
After purchase, you will receive a download link to the report you purchased. Please confirm the email address you use to purchase the report is the email address you would like to receive the report.
If you have any trouble receiving the download instructions, please first check any spam or junk folders. Reach out to support if you need further assistance.
PR-218-174512-R01 Full-Scale Surface Loading Testing of Buried Pipes
Quantity
Digital products are limited to 1 per purchase
List Price
$250
Member Price
$0
Members will be redirected to a member-only report database for access to all reports. You must have a login to access reports for free.