Research Report Library > Reports
Report
PR-218-063505-R03 Safe Inspection Procedures for Dent and Gouge Damage
Abstract
Recommendations are often made that the operating pressure of a pipeline be reduced prior to investigating suspected mechanical damage in the field, due to the unknown severity of the dam-age. The ensuing question is: knowing only what can be inferred from in-line inspection and the characteristics of the pipeline, what is the appropriate amount of pressure reduction? A common recommendation is to lower the operating pressure to 80% of a recent high pressure level. Oper-ators may question whether the same pressure reduction is necessary or adequate for all pipelines, e.g. different Location Classes, and all modes of damage, e.g. rock-induced damage as opposed to encroachment damage. With some operations, pressure reduction by an arbitrary proportion is impractical or very costly.
Two levels of assessment are provided: a conservative “Level 1” assessment relying mainly on qualitative information and requiring no calculation, and a “Level 2” assessment that is consider-ably more involved but which could justify a smaller pressure reduction (or even no pressure re-duction). The choice of assessment level will depend on the information available to the operator, as well as on the degree of conservatism the operator desires to invoke.
This report presents procedures for determining whether or not a pressure reduction is needed to assure safety of maintenance personnel before excavating and examining plain dents or dent-with-gouge defects on pipelines based on information obtained from in-line inspection (ILI) data. The procedures also allow for calculating the amount of pressure reduction that is needed.
Digital Access
After purchase, you will receive a download link to the report you purchased. Please confirm the email address you use to purchase the report is the email address you would like to receive the report.
If you have any trouble receiving the download instructions, please first check any spam or junk folders. Reach out to support if you need further assistance.
PR-218-063505-R03 Safe Inspection Procedures for Dent and Gouge Damage
Quantity
Digital products are limited to 1 per purchase
List Price
$250
Member Price
$0
Members will be redirected to a member-only report database for access to all reports. You must have a login to access reports for free.