Abstract
This report discusses the results of a testing program designed to simulate the operational conditions imposed on a J-lay installed, 13%” subsea pipeline assembled with mechanical connections. The program objective was to gain an understanding of the long-term sealing integrity of various mechanical connections. The connections were subjected to combinations of cyclic internal pressure, cyclic temperature, axial compression, and reverse torsion. The testing results show that the mechanically interlocked Reflange C-Con II connection and two premium threaded connections, the Hunting Fox and Sumitomo Varn Ace, when assembled utilizing suitable bonding agents, successfully resisted the imposed loads of this testing program. In addition, the selection of a proper bonding agent or adhesive to prevent reverse torque back out proved to be important as several of these agents were unreliable in preventing back out failures. The testing conditions applied to the mechanical connections in this test program are believed to be conservative, exceeding the maximum that in-service, J-lay installed pipelines are likely to experience. Therefore, this test program may be used to select a pipeline connection for this duty.
Digital Access
After purchase, you will receive a download link to the report you purchased. Please confirm the email address you use to purchase the report is the email address you would like to receive the report.
If you have any trouble receiving the download instructions, please first check any spam or junk folders. Reach out to support if you need further assistance.
PR-209-9217-R01 Mechanical Connections for J-lay
Quantity
Digital products are limited to 1 per purchase
List Price
$995
Member Price
$0
Members will be redirected to a member-only report database for access to all reports. You must have a login to access reports for free.
